We Are Outliers
Article27 November 2026

3D animation for mining companies: what to show and how to keep it compliant

What 3D animation is used for by a listed mining company, from orebody models to community explainers, the disclosure rule behind each use, what NI 43-101, the JORC Code and the ASX rules say about technical pictures, what drives cost and time, and how to brief an animation team.

FilmInvestor experience

3D animation for mining companies turns a deposit, a drill programme, a mine plan or a process plant into pictures an investor can follow in a minute. For a listed miner every frame is disclosure: National Instrument 43-101 counts a picture or a map as written disclosure, and on ASX the JORC Code covers presentations and website content. So the qualified person or competent person reviews the model, and the animation shows only what the company has declared.

This guide is for the chief executive, the investor relations lead and the technical team of a listed explorer or developer: what mining 3D animation is used for, the rules on technical pictures, what drives cost and time, and how to brief an animation team. For the firms that make mining film and animation, see our guide to mining video production companies.

What 3D animation is used for in mining

Mining animation shows what is under the ground, or not yet built, to people who will never stand on the site. Each use has its rule.

The uses of 3D animation for a listed mining company, and the disclosure rule that applies to each
UseWhat it showsThe disclosure rule that applies
Orebody and deposit modelsThe shape of the mineralised body, the drill holes through it, the grade shellsOnly the declared resource categories, each shown separately, inferred never merged with the others (NI 43-101 s.2.2); no tonnage or grade for anything not yet a resource (s.2.3(1)(a))
Drill programme visualisationHoles drilled and planned, collars, traces and interceptsLocation, azimuth, dip and depth, and true widths where known (NI 43-101 s.3.3(2)); a plan of collars and sectional views (JORC Code clause 19)
Exploration targetsWhere the company thinks there may be moreQuantity and grade only as ranges, with the basis and the caution given equal prominence (NI 43-101 s.2.3(2)); shown in a picture, the same text goes with it (JORC clause 17)
Mine plans and process flowThe pit or the underground workings, haulage, the plant and the flowsheetProduction rates, costs or mine life count as economic analysis and may need a technical report behind them (CSA Staff Notice 43-309 s.5.3); PEA and scoping study cautions (NI 43-101 s.2.3(3), JORC clause 38)
Site and infrastructureRoads, power, water, the camp and the land around the projectWhat exists and what is planned kept visibly apart; plans are forward-looking information with their assumptions stated (SN 43-309 s.6)
Investor decks, AGMs and the websiteLoops and stills for the deck, the AGM screen and the websiteWebsites and presentations are disclosure (NI 43-101 s.1.1; ASX Listing Rule 5.6 and its note); the qualified person named (s.3.1)
ESG and community explainersHow the mine would work, water, closure and rehabilitationBalanced and not misleading, with no early-stage plan shown with unwarranted certainty (CSA Staff Notice 51-356)

Our summary, with the rules as we read them on 27 November 2026 in NI 43-101, CSA Staff Notices 43-309 and 51-356, the JORC Code 2012 and ASX Listing Rules chapter 5. Companies listed elsewhere follow their own exchange and regulator.

What NI 43-101 and JORC say about technical pictures

Neither rulebook names animation. Both reach every picture a company makes public about its project.

  • A picture is disclosure. NI 43-101 defines written disclosure as “any writing, picture, map, or other printed representation”, on paper or electronic, including websites, and disclosure as any oral statement or written disclosure (s.1.1). So the model, the captions and the narration are all covered. Technical information about a material project must be prepared or approved by a qualified person (s.2.1), who is named in written disclosure (s.3.1). Of 130 mining investor presentations CSA staff reviewed, only 54 named one.
  • Show only what has been declared. Mineral resources are shown in their categories, each separately, and inferred resources are not added to the others (s.2.2). A company may not disclose the quantity, grade or metal content of a deposit that is not a declared resource or reserve (s.2.3(1)(a)). In an ore body animation, the grade shell stops where the declared resource stops, and each category has its own colour and label.
  • Exploration targets carry their words with them. A target may be shown only as ranges of quantity and grade, with an equally prominent statement that it is conceptual, that there has been insufficient exploration to define a resource and that it is uncertain further exploration will (NI 43-101 s.2.3(2)). The JORC Code says the same of a target “shown pictorially (for instance as cross sections or maps)”: it must be accompanied by that text (clause 17). CSA staff found 79 per cent of the exploration targets in the presentations they reviewed did not comply.
  • PEA and inferred resources need their caution on screen. Results of a preliminary economic assessment that rely on inferred resources may be disclosed only with an equally prominent statement that the study is preliminary, that inferred resources are too speculative geologically to be categorised as reserves, and that there is no certainty the study will be realised (s.2.3(3)). Of 34 presentations with PEA results, 56 per cent lacked it. Agree with your qualified person and counsel how the caution appears on screen when the figures do.
  • No in-ground value, no unexplained equivalents. NI 43-101 bars the gross value of metal in a deposit or a drill intersection, and a metal equivalent grade without each metal’s grade (s.2.3(1)(c) and (d)). The JORC Code treats in-ground dollar valuations as a breach of its principles (clause 51). A dollar counter ticking up over a glowing orebody is both.

Visual scale honesty in a geological animation

No rule sets a camera angle or a vertical exaggeration. The rules set the test instead. The JORC Code requires a public report to give enough clear, unambiguous information that the reader is not misled (clause 4), says exploration results must not be presented so as to unreasonably imply that potentially economic mineralisation has been discovered (clause 19), and asks for maps and sections “with scales” (Table 1, Diagrams). CSA Staff Notice 51-356 gives a visual example of misleading promotion: photographs of assayed core beside new core, implying mineralisation before third-party verification.

  • Keep the scale on screen. A scale bar and a north arrow in every technical shot, and any vertical exaggeration stated in a caption.
  • Show true width, or say it is unknown. NI 43-101 asks for true widths where known (s.3.3(2)(c)); the JORC Code asks for a qualification where they are not reported (clause 19). A camera move should not make a 2-metre intercept read like 20.
  • Show the low grades as well as the high. The JORC Code’s balanced reporting criterion asks for representative low and high grades or widths. CSA staff suggest representative drill sections can help.
  • Mark what is extrapolated. Where an inferred resource is extrapolated beyond the sample points, the JORC Code asks for a diagram showing clearly the extrapolated part (clause 21). A model is the natural place to show it.
  • Keep the language plain. CSA staff named “world-class”, “spectacular and exceptional results”, “production ready” and “ore” used of mineral resources as terms that may be overly promotional or misleading; 38 per cent of the presentations they reviewed had such statements.

ASX Listing Rules 5.6 and 5.22 for a mining animation

  • JORC applies to the animation. Listing Rule 5.6 applies the reporting rules and the JORC Code to any public report on exploration targets, exploration results, resources, reserves or production targets, and its note names presentations and website content. JORC clause 6 says the same of website postings and presentation material.
  • The competent person consents to form and context. An announcement of exploration results or resources for a material project names the competent person, says whether they are an employee, names their professional body, and is issued only with their prior written consent to the form and context (rule 5.22). The competent person should see the frames, not only the figures.
  • Production targets carry a fixed caution. A production target partly based on inferred resources carries, proximate to it and with equal prominence, the statement that there is a low level of geological confidence in inferred resources and no certainty the target will be realised (rule 5.16.4). A production target may not rest solely on an exploration target (rule 5.15).

What drives the cost and timeline of a mining animation

Animation is quoted by the job, and we found no published rate card for mining work to cite. One public figure exists: in 2019 EnGold Mines announced a 3D model of its Lac La Hache project from VRIFY for its website, at a cost of $12,500 paid in 208,333 shares at a deemed $0.06. That was an interactive model, not a film, and it is seven years old. Cost and time move with the same few lines:

  • The data. Whether the drill database, the block model and the topography exist in a usable format, or must be rebuilt from the technical report.
  • The number of scenes and their detail. A schematic section takes far less work than a photoreal fly-through of a pit, a plant and a port.
  • The versions. A website loop, deck stills, an AGM cut, social cuts, narration, languages, and any filming on site to cut with it.
  • Review rounds. Storyboard, first render and final, each with the qualified person or competent person and counsel.
  • The news calendar. An animation waiting on a resource estimate waits with it, and a new result mid-production means rework. Build the model to be updated.

How to brief a mining 3D animation team

  1. Say who will watch and where. Investors on the website, analysts in a meeting, the AGM, or the community near the project. The audience decides the detail.
  2. Send the filed documents. The current technical report, the resource statement with its effective date, and the releases the animation will draw on.
  3. Send the data. Collars, surveys and assays from the drill database, the resource wireframes or block model, and the topography or a drone survey of the site.
  4. Name the reviewer and the review points. The qualified person or competent person, and counsel, sign off the storyboard, the first render and the final, including narration and captions.
  5. Set the rules for the picture. Resource categories by colour, scale bars and north arrows, true widths, planned and built kept apart, and where each caution appears.
  6. Plan the update. Agree how the model changes when the next estimate or result is released, so it never shows an old number beside a new release.

Where we fit

We Are Outliers offers 3D animation for mining companies as part of our mining film work, made with the same review steps as everything else we publish for a listed company. Our published mining work is the film we shot for Teako Minerals from the air, on the ground and underground across Norway, and the investor hub on its website that puts every project on the licence map of Norway. An animation is one part of what an investor sees, so it should match the investor website, the brand and the plan your investor relations agency runs.

If you have a model your geologists understand and your investors do not, book a call.

Questions

What is 3D animation used for by mining companies?

To show what investors and communities cannot see: the orebody and the drill holes through it, the mine plan and process flow, the site and its infrastructure, and closure and rehabilitation. Listed miners use it on the website, in the deck, at the AGM and between news releases.

Does NI 43-101 apply to a mining animation?

Yes. NI 43-101 defines written disclosure to include any picture or map, on paper or electronic, including websites, and disclosure includes oral statements, so the model, the captions and the narration are all covered. Technical content about a material project must be prepared or approved by a qualified person, who is named.

Can an animation show an exploration target or inferred resources?

Yes, under the rules that apply to words. A target is shown only as ranges, with its caution given equal prominence, and the JORC Code says a target shown in sections or maps must carry that text. Inferred resources are their own category, never merged with indicated or measured.

How much does a mining 3D animation cost?

It depends on the job, and we found no published rate card for mining animation to cite. The cost moves with the state of the data, the number of scenes and their detail, the versions and languages, any filming on site, and the review rounds with the qualified person and counsel. Ask for a quote that lists each of those lines.

What does an animation team need from a mining company?

The current technical report and resource statement, the releases the animation draws on, the drill database, the resource wireframes or block model, and the topography. And the name of the qualified person or competent person who reviews each stage.

Read next
Sources
  1. National Instrument 43-101, Standards of Disclosure for Mineral Projects, sections 1.1 (“disclosure” and “written disclosure”), 2.1 to 2.3, 3.1 and 3.3 (BC consolidation current to 17 November 2026), read 27 November 2026
  2. CSA Staff Notice 43-309, Review of Website Investor Presentations by Mining Issuers (9 April 2015), sections 2.2, 5.1, 5.2, 5.3, 6 and 7, read 27 November 2026
  3. CSA Staff Notice 51-356, Problematic Promotional Activities by Issuers (29 November 2018), parts III and IV, read 27 November 2026
  4. The JORC Code, 2012 Edition, clauses 4, 6, 17, 19, 21, 38 and 51 and Table 1 section 2 (Diagrams, Balanced reporting), read 27 November 2026
  5. ASX Listing Rules, Chapter 5 (pages dated 1 July 2022), rules 5.6 and its note, 5.15, 5.16 and 5.22, read 27 November 2026
  6. EnGold Mines Ltd., EnGold & VRIFY Finalize 3D Investor Graphics Project & Shares for Services Agreement (26 November 2019), read 27 November 2026

This article describes the rules in general terms, as we read them on 27 November 2026. It is not legal, financial or securities advice. Your counsel and your qualified person or competent person decide what your company publishes.

Where we publish
Take me to all insights
Project brief

Tell us what you want to win.

Two questions and where to reply. The rest is a conversation.

Which are you?

A founder reads every one of these. You hear back within one working day.

Rather be asked one question at a time? The full brief